The contract for “Mardin Storage Gravity Irrigation Material Procurement” tendered by GAP 15th Regional Directorate of the General Directorate of State Hydraulic Works was signed between ALFEBOR and DSI 15th Regional Directorate on 04.03.2021. Within the scope of the Project, a total of 33.173 meters of ALFEBOR GRP pipes and component parts will be produced in our factory.
https://www.alfebor.com.tr/wp-content/uploads/2021/03/Kayacık-Sulaması-Foto-2.jpg1024768Arda Baysalhttps://www.alfebor.com.tr/wp-content/uploads/2024/02/logo_alf-1.pngArda Baysal2021-03-10 10:19:262021-03-10 10:19:26MARDIN STORAGE GRAVITY IRRIGATION MATERIAL PROCUREMENT
Devlet Su İşleri Genel Müdürlüğü GAP 15. Bölge Müdürlüğü tarafından ihale edilen “Mardin Depolaması Cazibe Sulaması Malzeme Temini” işinin sözleşmesi 04.03.2021 tarihinde ALFEBOR ile DSİ 15. Bölge Müdürlüğü arasında imzalanmıştır. Proje kapsamında fabrikamızda toplam 33.173 metre ALFEBOR CTP boru ve özel parça üretimi yapılacaktır.
https://www.alfebor.com.tr/wp-content/uploads/2021/03/Kayacık-Sulaması-Foto-2.jpg1024768Arda Baysalhttps://www.alfebor.com.tr/wp-content/uploads/2024/02/logo_alf-1.pngArda Baysal2021-03-10 10:18:252021-03-10 10:18:25MARDİN DEPOLAMASI CAZİBE SULAMASI MALZEME TEMİNİ
The first deliveries of ALFEBOR GRP pipes in the diameter range of DN 800mm-DN 3400mm, which were produced within the framework of the “Kayacık Irrigation 1st Section (Kayacık + Doğanpınar) Material Procurement (GRP) 2nd Section Work” of the 20th Regional Directorate of State Hydraulic Works have been completed and the production work continues rapidly.
Devlet Su İşleri 20. Bölge Müdürlüğü’ne ait “Kayacık Sulaması 1. Kısım (Kayacık+Doğanpınar) Malzeme Alımı (CTP) 2. Kısım İşi” çerçevesinde üretimi gerçekleştirilen DN 800mm-DN 3400mm çap aralığındaki ALFEBOR CTP boruların ilk teslimatları gerçekleştirilmiş olup, fabrikamızda üretim çalışmaları hızlı bir şekilde devam etmektedir.
https://www.alfebor.com.tr/wp-content/uploads/2021/03/Kayacık-Sulaması-Foto-1.jpg6941504Arda Baysalhttps://www.alfebor.com.tr/wp-content/uploads/2024/02/logo_alf-1.pngArda Baysal2021-03-10 08:00:162021-03-10 08:02:00DSİ KAYACIK SULAMASI CTP ALIMI İŞİ
Pikaron İnşaat’ın Musul’da gerçekleştirdiği Sulama Projesi’ne ait CTP boruların üretimleri devam etmektedir. Proje kapsamında DN400-DN3000 çap aralığında 22155 m boru üretimi tamamlanarak ihracatı gerçekleştirilecektir.
https://www.alfebor.com.tr/wp-content/uploads/2020/05/Alfebor-Musul-3-1.jpg12001600Arda Baysalhttps://www.alfebor.com.tr/wp-content/uploads/2024/02/logo_alf-1.pngArda Baysal2020-05-20 09:43:102020-05-20 09:55:36MUSUL SULAMA PROJESİ
DSİ DISTRICT 8 ERZURUM SAKALIKESİK PLAIN IRRIGATION DISTRICT 2 CONSTRUCTION & MATERIAL PURCHASE
Specifications : Ø 500-600-700-800-1000-1400-1500-1800.6-10 PN 5000 SN CTP PIPE
Quantities : 3759 m
https://www.alfebor.com.tr/wp-content/uploads/2018/09/unnamed.jpg279512Arda Baysalhttps://www.alfebor.com.tr/wp-content/uploads/2024/02/logo_alf-1.pngArda Baysal2018-09-02 02:27:322021-02-03 15:56:13SAKALIKESİK PLAIN IRRIGATION DISTRICT 2 CONSTRUCTION
MARDIN STORAGE GRAVITY IRRIGATION MATERIAL PROCUREMENT
The contract for “Mardin Storage Gravity Irrigation Material Procurement” tendered by GAP 15th Regional Directorate of the General Directorate of State Hydraulic Works was signed between ALFEBOR and DSI 15th Regional Directorate on 04.03.2021. Within the scope of the Project, a total of 33.173 meters of ALFEBOR GRP pipes and component parts will be produced in our factory.
MARDİN DEPOLAMASI CAZİBE SULAMASI MALZEME TEMİNİ
Devlet Su İşleri Genel Müdürlüğü GAP 15. Bölge Müdürlüğü tarafından ihale edilen “Mardin Depolaması Cazibe Sulaması Malzeme Temini” işinin sözleşmesi 04.03.2021 tarihinde ALFEBOR ile DSİ 15. Bölge Müdürlüğü arasında imzalanmıştır. Proje kapsamında fabrikamızda toplam 33.173 metre ALFEBOR CTP boru ve özel parça üretimi yapılacaktır.
DSI KAYACIK IRRIGATION GRP PROCUREMENT PROJECT
The first deliveries of ALFEBOR GRP pipes in the diameter range of DN 800mm-DN 3400mm, which were produced within the framework of the “Kayacık Irrigation 1st Section (Kayacık + Doğanpınar) Material Procurement (GRP) 2nd Section Work” of the 20th Regional Directorate of State Hydraulic Works have been completed and the production work continues rapidly.
DSİ KAYACIK SULAMASI CTP ALIMI İŞİ
Devlet Su İşleri 20. Bölge Müdürlüğü’ne ait “Kayacık Sulaması 1. Kısım (Kayacık+Doğanpınar) Malzeme Alımı (CTP) 2. Kısım İşi” çerçevesinde üretimi gerçekleştirilen DN 800mm-DN 3400mm çap aralığındaki ALFEBOR CTP boruların ilk teslimatları gerçekleştirilmiş olup, fabrikamızda üretim çalışmaları hızlı bir şekilde devam etmektedir.
PROJET D’IRRIGATION DE MOSUL
MUSUL SULAMA PROJESİ
Pikaron İnşaat’ın Musul’da gerçekleştirdiği Sulama Projesi’ne ait CTP boruların üretimleri devam etmektedir. Proje kapsamında DN400-DN3000 çap aralığında 22155 m boru üretimi tamamlanarak ihracatı gerçekleştirilecektir.
MUSUL IRRIGATION PROJECT
DSİ DENİZLİ HONAZ IRRIGATION CONSTRUCTION
DSİ DENİZLİ HONAZ IRRIGATION CONSTRUCTION
Specifications : Ø 800-900-1000 Radius, 4 ATÜ 5000 SN CTP PIPE
Quantities : 4186 m
SAKALIKESİK PLAIN IRRIGATION DISTRICT 2 CONSTRUCTION
DSİ DISTRICT 8 ERZURUM SAKALIKESİK PLAIN IRRIGATION DISTRICT 2 CONSTRUCTION & MATERIAL PURCHASE
Specifications : Ø 500-600-700-800-1000-1400-1500-1800.6-10 PN 5000 SN CTP PIPE
Quantities : 3759 m
ERGANİ IRRIGATION CONSTRUCTION
DSİ DISTRICT 10 DİYARBAKIR ERGANİ IRRIGATION CONSTRUCTION
Specifications : Ø 600-700-800-900-1000-1100-1200.6-10 PN 5000 SN CTP PIPE
Quantities : 12830 m